Kitchen Remodel: Glazier Way
This project was completed in September of 2008.
May 15, 2008
This 1960s ranch will be getting
a new kitchen, mudroom, powder
room and utility room.
Some photos of the dated existing
kitchen: too small, poor layout, and
insufficient storage.
The powder room will be reconfigured,
with new fixtures, wall treatment
and tile floor.
Here’s a rendering of the new kitchen,
with Cherry cabinets, new tile floor, a pass-thru
to the dining room, and new windows
with a view to the woods beyond.
![]()
![]()
May 21, 2008
![]()
![]()
June 11, 2008
Anne Balsillie is the lead carpenter for
the project. Great job, Anne!
![]()
June 24, 2008
Recessed lights and new
high velocity air conditioning
ducting are installed.
![]()
July 7, 2008
This kitchen will be getting an underfloor
radiant heating system. The wire mesh
is being laid to cover the hot water pipes.
Lightcrete will be poured over the mesh to serve
as a base for the final tile floor.
![]()
July 21, 2008
To create a better floor plan, we shifted
the location of the mudroom door. You
can see where the siding has been patched.
![]()
August 1, 2008
Now that the tile floor has been
installed, we can start installing the
cabinets; in this case, the
base for the sink.
On the other side of the room,
the bookcases are beginning to take shape.
Here’s a glimpse of the newly
refurbished powder room,
awaiting its mirror.
![]()
August 18, 2008
This custom corner will house
a television as well
as a microwave.
Here’s the sink, installed, with
a lovely view of the woods.
![]()
September 1, 2008
The new entry/mudroom now
sports custom cubbies to organize
all that “stuff.”
Now the TV and microwave have
been installed: a perfect fit!
![]()
September 15, 2008