1st Floor Remodel: Marra Dr.
Completed July 2023
AFTER PHOTOS
Time to update your Ann Arbor 90s kitchen? Our clients certainly thought so and reached out to Rochman Design Build to do the remodel. The new kitchen is striking in its dark wood and vibrant red sink. In addition to the kitchen we also reconfigured and remodeled the first floor with a focus on a stunning hand built staircase, gave the fireplace a facelift, giving the space gorgeous natural finish with Scandinavian feel.
March 24, 2023
It’s demolition week 😊
March 31, 2023
In the living room, Dave is taking the fireplace apart.
The new fireplace will be situated a bit lower.
Although a similar photo, we wanted to show the staircase that is about to be disassembled.
April 5, 2023
Zack is working on rebuilding the staircase.
April 12, 2023
The kitchen is given a wider entry way to the living room.
May 1, 2023
The ceiling has been repaired, primed, and painted; the painter is cleaning up from wall repair.
The chimney chase had its old tile removed and new drywall applied. Fireplace opening was lowered and new gas fireplace installed. The paneling that used to flank the fireplace was removed and patched in and new tile will become the fireplace surround to a height of about 4’. It will then receive a modest wood mantel to break up between tile and drywall.
May 11, 2023
It’s painting week…
The walls where cabinets go are primed and given one coat of color.
The ceilings are primed and painted.
May 17, 2023
The floors used to have a darker finish, reminiscent of the 90s. They now have a lighter, natural finish.
Stepping away from the finished floors, Zach unpacks the kitchen cabinetry and starts laying out the kitchen.
May 24, 2023
Cabinetry installation is in full force.
Even though you get to see some of the colors here,
it is definitely not reflective of the wow power that will be coming soon.
June 5, 2023
The cabinets are installed and have their doors, and next is the hardware.
June 15, 2023
Once the hardware is all in, it’s time for the countertop to go in.
On the staircase, the posts are being installed, followed by the wires and railing.
June 22, 2023
In the kitchen, the backsplash is all done and we’re ready for the gorgeous red sink.
The colors are going to be dramatic!
And the installation of the railing for the staircase continues but is almost done.
June 30, 2023
In the kitchen, those empty appliance spaces have happily received their missing pieces.
In the living room, the fireplace tiles, Yohen Border Gold Mix 1/2x4 Mosaic, are being installed.
The mantle is a 2x6 oak with a thin layer of paint to allow the wood grain to be easily seen. The TV, mounted slightly above, is covered for dust protection.
July 13, 2023
The staircase is finished and gorgeous!!! The “ViewRail” railing has stainless steel “Onyx” horizontal balusters, wood treads, risers, and a clear finished red oak cap rail.