Sunroom Remodel: Morton Ave.
This is our 3rd project for our awesome clients in the Burns Park neighborhood of lovely Ann Arbor. For this project, the Rochman Design Build team will be remodeling the Sunroom, used as a playroom for years, into an expanded space of the living room where our clients can gather with their expanding family for holiday dinners and family gatherings. Please follow along this current work blog to see the transformation.
Renderings of the view from the living room into the expanded Sunroom space.
The view from the Sunroom into the living room, with a pass through from the Sunroom to the kitchen,
to help manage large dinners ๐
January 29, 2025
Itโs demolition week. Time to take out the old and get ready for the new.
February 6, 2025
We removed the cabinets in the playroom (original sunroom) And enlarged the opening to the living room, making it easier for our clients to handle a table for 30๐.
February 12, 2025
Reframing for a larger opening between the living room and playroom.
Reframing the old window into a passthrough window.
Cutting channel in the ceiling to receive new sound insulation between the playroom and the primary bedroom above.
February 18, 2025
The elaborate archwayโs main goal is to conceal the HVAC trunk lines as well as create a cabinet nook. Combining function + beauty is all part of what makes usโฆ us ๐
It might not look like it but here weโre furring out kitchen brick veneer so that weโre able to hang drywall. (FYI โ or rather, FMI - To "furr out" brick veneer means installing furring strips (thin wooden or metal boards) to create an overhang for the veneer, which is a non-structural brick layer, often for aesthetics.)
March 7, 2025
We know it felt like a long time for walls to be open, but finally it is time for drywall ๐
March 17, 2025
Getting the floors ready.
Which color stain should we go with?
Bona Cocoa it is ๐
March 25, 2025
The new windows have been installed along with the interior and exterior trim.
The new bookcases are in.
The new passthrough window has a Quartz sill.
March 31, 2025
The floors on the first floor are being refinished.
April 7, 2025
The floors are done and some of the furniture is even back in ๐